Sunday, June 17, 2007
Last week a presentation of the bridge linking the Crimea with the Krasnodar region of Russia took place in Ukraine. The project cost of the deal is estimated at US$480 million. According to specialists, the bridge can be built within two years given adequate preparation.
The bridge project includes building a highway with the width of 15 metres; there will also be a possibility of the bridge supporting a future oil pipeline. The total length of the bridge will be about 4.5 kilometres.
The bridge over the Strait of Kerch could become a transit way to more than 10 million people a year and should decrease the travel distance from Ukraine to the Krasnodar Region by 450 kilometres.